| 1 | CNC Machined Shafts | Power transmission, pumps, motors, automation equipment | Carbon steel, stainless steel, alloy steel, aluminum | Generally ±0.02–0.05 mm; tighter areas may require ±0.01 mm | CNC turning, milling, grinding, heat treatment | US$2–18, depending on diameter, material, and finishing | 3–6 weeks after drawing approval | Dimensional inspection, concentricity, runout, surface roughness, material certification, hardness | Medium | Runout control, material traceability, repeatability, and corrosion protection |
| 2 | Gears and Sprockets | Gearboxes, conveyors, agricultural machinery, industrial drives | Alloy steel, carbon steel, stainless steel, engineering plastics | Typically ISO grade-dependent; tooth profile and pitch accuracy are critical | Hobbing, shaping, broaching, CNC machining, heat treatment | US$4–45, depending on module, size, tooth count, and heat treatment | 4–8 weeks after technical confirmation | Tooth profile, pitch error, backlash, hardness, case depth, runout, visual inspection | High | Tooth accuracy, wear resistance, noise performance, and stable heat treatment |
| 3 | Bearings and Bushings | Rotating equipment, electric motors, pumps, linear motion systems | Bearing steel, bronze, brass, PTFE composites, sintered metals | Usually controlled in microns for bore, outside diameter, and clearance | Precision turning, grinding, honing, sintering, surface treatment | US$0.80–20, depending on size, precision, and construction | 2–6 weeks for standard designs; longer for custom parts | Bore and outside diameter, radial clearance, roundness, surface finish, noise, lubrication compatibility | Medium | Dimensional stability, service life, low friction, cleanliness, and reliable packaging |
| 4 | Fasteners | Construction equipment, automotive assemblies, machinery frames, maintenance parts | Carbon steel, stainless steel, alloy steel, brass | Standard-based tolerance; thread class and length accuracy are key | Cold heading, thread rolling, machining, heat treatment, plating | US$0.03–2.50, depending on size, grade, finish, and quantity | 2–5 weeks for standard products; 5–8 weeks for special designs | Thread gauge inspection, tensile strength, proof load, hardness, coating thickness, salt spray testing | Low | Correct grade, thread compatibility, coating durability, packaging, and lot consistency |
| 5 | Metal Brackets and Mounting Plates | Electrical cabinets, HVAC equipment, automation systems, machine frames | Carbon steel, stainless steel, aluminum | Typically ±0.10–0.30 mm for formed features; tighter holes may require more control | Laser cutting, punching, bending, welding, powder coating | US$1–12, depending on thickness, geometry, and finishing | 2–5 weeks after drawing approval | Hole position, bend angle, flatness, weld quality, coating thickness, appearance | Low | Fit-up accuracy, surface protection, packaging against deformation, and low tooling cost |
| 6 | Cast Housings | Gearboxes, pumps, valves, motors, industrial control equipment | Cast iron, ductile iron, aluminum alloy, steel casting | As-cast tolerance is broader; machined interfaces commonly require ±0.05–0.20 mm | Sand casting, investment casting, die casting, CNC machining | US$8–120, excluding or including tooling depending on quotation structure | 6–12 weeks, including tooling and first-article approval | Porosity, wall thickness, hardness, pressure leakage, machining allowance, dimensional inspection | High | Defect prevention, tooling control, pressure integrity, machining consistency, and schedule management |
| 7 | Precision Pins and Rollers | Linkages, hinges, chain systems, indexing mechanisms, linear guides | Hardened steel, stainless steel, tool steel, bearing steel | Commonly ±0.005–0.03 mm for diameter and controlled roundness | CNC turning, centerless grinding, heat treatment, polishing | US$0.20–8, depending on diameter, length, hardness, and finish | 3–6 weeks after specification approval | Diameter, roundness, straightness, hardness, surface roughness, magnetic particle testing where applicable | Medium | Wear resistance, smooth movement, surface finish, and consistent batch dimensions |
| 8 | Springs | Valves, actuators, suspension systems, latches, industrial controls | Spring steel, stainless steel, music wire, nickel alloys | Free length and force tolerance depend on design; force accuracy is often more important than size | Wire forming, coiling, heat setting, shot peening, surface coating | US$0.10–6, depending on wire diameter, shape, and performance requirements | 3–6 weeks after sample approval | Load-deflection test, free length, coil diameter, cycle life, surface defects, material composition | Medium | Consistent force, fatigue life, correct material, corrosion resistance, and sample validation |
| 9 | Seals and O-Rings | Hydraulic systems, pneumatic equipment, pumps, engines, fluid-control assemblies | NBR, EPDM, FKM, silicone, polyurethane, PTFE | Standard groove and seal dimensions; compression and flash limits are critical | Compression molding, injection molding, extrusion, die cutting | US$0.05–5, depending on compound, size, profile, and tooling | 3–8 weeks for custom profiles; standard sizes may be faster | Material compound, hardness, compression set, leakage, dimensional inspection, temperature and chemical compatibility | Medium | Correct compound, sealing performance, shelf life, traceability, and contamination control |
| 10 | Welded Frames and Fabricated Assemblies | Machine bases, material-handling systems, safety guards, industrial platforms | Carbon steel, stainless steel, aluminum | Overall assembly tolerance commonly ±1–3 mm; machined interfaces require tighter control | Laser cutting, bending, welding, stress relieving, machining, painting | US$25–600, depending on size, weight, weld length, and finishing | 4–10 weeks after drawing and welding procedure approval | Weld visual inspection, dimensional alignment, weld penetration, flatness, load testing, coating inspection | High | Structural integrity, distortion control, lifting and packing plans, inspection documentation, and on-time capacity |