| 1 | Rated Load and Safety Margin | 15% | Rated payload against the maximum coil mass, coil dimensions, and load distribution in your application. | Technical datasheet, load calculation, and documented proof-load or acceptance-test procedure. | _____ |
| 2 | Coil Cradle and Load Restraint | 12% | Cradle geometry, coil orientation, contact surfaces, and provisions to prevent rolling or shifting during movement. | Dimensioned drawings, material details, and a test or operating procedure for securing the coil. | _____ |
| 3 | Travel Path and Turning | 10% | Compatibility with the route, floor layout, turning points, gradients, clearances, and any rail or track requirements. | Route review, turning or positioning drawings, and confirmation of applicable floor and track conditions. | _____ |
| 4 | Drive, Power, and Duty Cycle | 10% | Drive configuration, power source, travel speed, operating hours, charging or cable arrangements, and expected cycle frequency. | Electrical and drive specifications, duty-cycle assumptions, and power or charging requirements. | _____ |
| 5 | Braking and Emergency Stops | 10% | Stopping performance under the specified load, braking method, emergency-stop locations, and behavior after power loss. | Safety-system description, risk assessment, and witnessed functional-test records. | _____ |
| 6 | Controls and Operator Protection | 10% | Control mode, visibility, warning devices, guarding, emergency access, and suitability for the operating environment. | Control-system description, operating manual, and applicable conformity or safety documentation. | _____ |
| 7 | Fabrication and Quality Control | 10% | Traceability of critical components, inspection processes, welding quality controls, and documented final testing. | Quality-system documents, inspection plans, component records, and sample factory or test reports. | _____ |
| 8 | Customization and Engineering Support | 8% | Ability to adapt dimensions, cradle design, controls, route interface, and operating requirements to the stated application. | Application-specific proposal, engineering drawings, interface list, and change-control process. | _____ |
| 9 | Service, Spares, and Warranty | 8% | Warranty terms, spare-parts availability, troubleshooting support, service coverage, and maintenance requirements. | Written warranty, recommended-spares list, maintenance schedule, and support-response terms. | _____ |
| 10 | Delivery, Testing, and Total Cost | 7% | Quoted scope, manufacturing and delivery schedule, installation or commissioning needs, acceptance criteria, and lifecycle costs. | Itemized quotation, project schedule, factory acceptance-test plan, and clearly stated exclusions. | _____ |