| Office building | 10–30 floors; several occupied floors with meeting rooms and enclosed interior spaces | Consistent voice and data service across work areas, elevators, lobbies, and shared spaces; capacity should reflect peak occupancy. | Concrete cores, coated glazing, dense interior walls, floor layout, and tenant density can affect signal and traffic demand. | Measure signal on every floor and in interior zones; map expected user density; confirm which operators and frequency bands need support. |
| Hospital or medical campus | Multiple wings or buildings; high occupancy and round-the-clock operations | Reliable service in patient areas, corridors, basements, and staff spaces; account for simultaneous voice and data use. | Clinical equipment, restricted areas, fire-rated partitions, phased construction, and operational continuity requirements. | Coordinate surveys with facilities and clinical teams; identify critical zones; plan installation and testing around access and service-continuity constraints. |
| Hotel or residential tower | 15–40 floors; repeated room layouts, common areas, and below-grade facilities | Usable coverage in rooms, corridors, amenity areas, parking, and elevators; estimate demand from guests or residents and staff. | Repetitive floor plans, reinforced concrete, low-emissivity windows, and limited riser space. | Test representative rooms and floors, then verify exceptions; inspect risers and equipment locations; include parking and other below-grade areas in the survey. |
| Convention center or large venue | Large open halls with changing layouts and high event-time occupancy | High capacity during peak events, with coverage across halls, concourses, meeting rooms, and service areas. | Variable crowd density, large open spans, movable partitions, high ceilings, and changing event configurations. | Model expected peak attendance and traffic; assess multiple event layouts; test handoffs and capacity in crowded areas, not only in empty halls. |
| Warehouse or distribution facility | Large floor plate; high ceilings; storage aisles and loading areas | Coverage along work routes, docks, offices, and safety-related areas; capacity depends on workforce and connected devices. | Metal racking, stored goods, moving vehicles, wide aisles, and frequent layout changes can create uneven signal. | Survey at working height and along aisles; include loading bays and offices; consider how rack height, inventory, and future layout changes may affect propagation. |
| Campus or mixed-use development | Several buildings with different uses, construction types, and occupancy patterns | Consistent service in priority buildings and shared outdoor-to-indoor transition areas; demand varies by use and time of day. | Different building materials, long distances between structures, shared infrastructure, and separate ownership or access requirements. | Assess each building separately before defining a common design; document coverage priorities, available pathways, and future expansion requirements. |