| Profile 1 | MIG/MAG, TIG, robotic welding | Carbon steel, stainless steel, aluminum | 1–12 mm | ISO 9001; welding procedures qualified to applicable project standards | Yes; low-volume samples and first articles | 3–6 weeks after drawing approval | Commercial export packing, inspection documents, and standard ocean freight support | General industrial enclosures and fabricated assemblies |
| Profile 2 | TIG, orbital welding, manual precision welding | Stainless steel, nickel alloys, titanium | 0.5–6 mm | ISO 9001; material traceability available by order | Yes; engineering review and sample validation | 4–8 weeks after approved specifications | Export documentation, heat-number tracking, and protective packaging | Clean-process equipment, tubing, and corrosion-resistant parts |
| Profile 3 | Laser welding, TIG, micro-welding | Stainless steel, aluminum, galvanized steel | 0.3–8 mm | ISO 9001; dimensional inspection records available | Yes; suitable for complex small assemblies | 2–5 weeks for standard assemblies | International freight coordination and multilingual technical documentation | High-appearance parts and lightweight precision assemblies |
| Profile 4 | FCAW, GMAW, submerged arc welding | Carbon steel, low-alloy steel, weathering steel | 6–40 mm | ISO 9001; project-specific welder and procedure qualifications | Limited; mainly for repeatable industrial designs | 6–12 weeks depending on steel grade and volume | Heavy-load packing, export crating, and container loading plans | Structural frames, platforms, brackets, and heavy equipment bases |
| Profile 5 | MIG/MAG, TIG, spot welding, press joining | Cold-rolled steel, galvanized steel, stainless steel | 0.8–5 mm | ISO 9001; incoming and final inspection procedures | Yes; tooling and pilot-run support available | 4–7 weeks after tooling or production approval | Flat-pack protection, palletization, and routine export paperwork | Electrical cabinets, machine guards, racks, and sheet-metal products |
| Profile 6 | Robotic MIG/MAG, TIG, resistance welding | Mild steel, stainless steel, aluminum | 1–10 mm | ISO 9001; statistical process controls for repeat production | Yes; optimized for repeat orders and production scaling | 5–10 weeks for medium-to-large batch orders | Container consolidation, quality dossiers, and scheduled shipment planning | Automotive-support components, furniture frames, and repeat assemblies |
| Profile 7 | TIG, MIG/MAG, pipe welding, pressure-tested fabrication | Carbon steel, stainless steel, aluminum | 1–25 mm | ISO 9001; inspection and pressure-test records available by contract | Yes; drawing review, samples, and test assemblies | 5–9 weeks depending on testing and surface treatment | Export packing, inspection coordination, and project shipment tracking | Tanks, manifolds, pipe assemblies, and process-system components |