| 1. Electrode Preparation | Electrode Slitting Machine | Cuts coated electrode rolls into precise strips for cylindrical cell winding. | Slit width, burr height, edge cleanliness, web tension, roll alignment, and dust control. | Slitting tolerance commonly controlled within approximately ±0.05 to ±0.10 mm, depending on product requirements. | Width measurement, edge-camera inspection, burr inspection, and roll hardness verification. |
| 2. Electrode Notching | Die-Cutting or Laser-Notching Machine | Creates electrode tabs or notches required for current collection and winding registration. | Notch position, notch geometry, cutting force or laser power, edge burrs, and particle generation. | Position accuracy is commonly specified at about ±0.10 to ±0.20 mm for high-speed production systems. | Vision inspection of notch shape, tab position, edge defects, and electrode continuity. |
| 3. Winding | Cylindrical Cell Winding Machine | Winds the anode, separator, and cathode into a compact jelly roll with controlled electrode and separator alignment. | Winding tension, separator overlap, electrode alignment, winding diameter, tab position, and end-face flatness. | Common cylindrical formats include 18650 at approximately 18 × 65 mm, 21700 at approximately 21 × 70 mm, and 4680 at approximately 46 × 80 mm. | Jelly-roll diameter, alignment, exposed-tab position, separator damage, wrinkles, and winding length. |
| 4. Jelly-Roll Finishing | Jelly-Roll Taping and Shaping Machine | Secures the wound roll, protects the separator, and prepares the assembly for insertion into the metal can. | Tape position, tape tension, roll compression, end-face condition, and foreign-particle control. | The finished roll must remain within the specified diameter and height envelope for the selected can size. | Visual inspection, dimensional gauging, tape adhesion, and end-face flatness checks. |
| 5. Can Preparation | Can Cleaning and Inspection Unit | Cleans, orients, and inspects the cylindrical metal can before jelly-roll insertion. | Cleanliness, can roundness, height, inner-wall condition, bottom geometry, and orientation. | Typical can materials include nickel-plated steel or stainless steel, selected according to cell design and safety requirements. | Camera inspection, dimensional gauging, cleanliness testing, and dent or scratch detection. |
| 6. Insulation Insertion | Insulating Film or Bottom Pad Insertion Machine | Places insulating components between the electrode assembly and the metal can to reduce internal short-circuit risk. | Film position, coverage, material compatibility, insertion depth, and absence of folds or tears. | Insulation thickness and shape are selected according to the electrical-clearance and thermal design of the cell. | Position verification, visual inspection, dielectric checks, and component presence detection. |
| 7. Jelly-Roll Insertion | Automatic Jelly-Roll Insertion Machine | Inserts the wound electrode assembly into the cylindrical can without damaging the separator or tabs. | Insertion force, insertion speed, roll orientation, tab direction, coaxiality, and can deformation. | Controlled insertion is essential because excessive force can cause separator displacement, tab damage, or can distortion. | Force-displacement curve, insertion depth, tab position, and post-insertion dimensional inspection. |
| 8. Tab Connection | Tab Welding Machine | Connects electrode tabs to the cap, terminal, or internal current-collecting structure. | Welding energy, pulse duration, electrode pressure, tab overlap, resistance, and heat-affected area. | Ultrasonic, resistance, and laser welding are commonly used, depending on tab material and cell architecture. | Weld resistance, pull strength, weld appearance, continuity, and cross-section sampling. |
| 9. Cap and Gasket Assembly | Cap, Gasket, and Insulator Assembly Machine | Positions the top cap, gasket, and insulating parts to provide electrical isolation and sealing preparation. | Component orientation, gasket seating, compression, terminal alignment, and part presence. | The gasket must maintain electrical isolation and sealing performance across the cell's operating temperature range. | Vision inspection, seating-height measurement, insulation verification, and component traceability. |
| 10. Electrolyte Filling | Vacuum Electrolyte Filling Machine | Introduces a measured quantity of electrolyte into the assembled cell under controlled atmosphere and vacuum conditions. | Filling mass, vacuum level, pressure profile, temperature, moisture, and electrolyte exposure time. | Electrolyte handling is normally performed in a dry room because lithium-ion materials are highly sensitive to moisture. | Filling-weight measurement, vacuum decay, moisture monitoring, leakage screening, and spill detection. |
| 11. Cell Sealing | Crimping and Cell Sealing Machine | Mechanically closes the cylindrical can around the cap and gasket to create the primary hermetic seal. | Crimping diameter, sealing height, forming force, tool concentricity, gasket compression, and cap position. | Seal dimensions are controlled against the can and cap drawing; the process must avoid gasket cuts and can cracking. | Seal-height measurement, visual inspection, dimensional gauging, and leak testing. |
| 12. Formation and Aging | Formation, Aging, and Testing System | Performs controlled charge and discharge cycles to form the solid-electrolyte interphase and stabilize cell performance. | Charge rate, discharge rate, voltage limits, temperature, rest time, capacity, and internal resistance. | Formation typically includes low-rate initial charging followed by defined rest and cycling steps; exact profiles depend on chemistry and design. | Capacity, voltage curve, DC internal resistance, self-discharge, temperature rise, and abnormal-voltage detection. |
| 13. Final Inspection and Sorting | OCV, IR, Dimension, and Sorting Station | Classifies finished cells by electrical performance, dimensions, appearance, and traceability status. | Open-circuit voltage, internal resistance, mass, dimensions, terminal condition, label or code readability, and data recording. | Cells are commonly grouped into matched performance bins before module or pack assembly. | Automated electrical testing, machine vision, weighing, barcode or data-matrix verification, and complete production-history records. |